Checklist : Plain Cement Concrete (PCC)

This checklist about Plain Cement Concrete (PCC) lists out points to take care of such as formwork, pouring, curing etc. during PCC work.

SrCheck ItemDone
1Check surface preparation.
2Check marking and levels to be done with respect to drawing.
3Check for form work.
4Check for finished level.
5Check for mixing of cement, sand and aggregate and adequate material.
6Check for pouring height.
7Do not allow extra cement mortar on top of PCC for smooth finishing.
8Check for aggregate test report (Fine aggregates / Cement / Water)
9Check for ramming with proper tools.
10Check for button marking for PCC thickness.
11Check for curing at least 7 days.